Bridge Maintenance
Thorpe Bridge, Southam

PROJECT DETAILS

Client:
Balfour Beatty Living Places, on behalf of Coventry City Council

Value:
£40,000

Specification:
Installation of scour protection to the abutments of the bridge that spans the River Itchen using stone filled gabions together with associated concrete and brickwork repairs.

WORKS

Dewatering:
The installation of an upstream barrier comprising driven interlocking piles and a polythene membrane with water pumped downstream of the site.

Gabion installation:
The preparation and levelling of the invert of the river bed in the bridge hole to receive the gabions. Gabion cages then assembled, placed in position and filled with 100mm/200mm stone. Grading of the invert of the river bed.

Concrete and Brickwork repairs:
Repairs to the concrete foundations and brickwork soffit of the arch undertaken. Brick stitch repair work also undertaken using resin bound helical bars.

Customer Comments

Following damage by a vehicle the barriers and retaining wall needed urgent repair. Haystoun quickly and safely made the repairs at this busy junction allowing traffic flow to be restored

Dave Elliott, Senior Bridge Engineer, Coventry City Council

Haystoun Construction
Unit B21b,
Holly Farm Business Park,
Honiley, Kenilworth,
Warwickshire, CV8 1NP

01926 484067 enquiries@haystoun.co.uk
  • Services
  • Civil engineering
  • Hard landscaping
  • Soft landscaping
  • Bridges & structures
  • Public realm and highway improvements
  • Concrete repair
  • Drainage & watercourse works
  • Other services
  • Company
  • About
  • Vacancies
  • Contact

© Haystoun Construction Limited

  • Privacy policy